0 ratings
AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red
This collar is designed to fit neck sizes from 12 to 17 inches, ensuring a snug and comfortable fit for your pet.
AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red

AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for

0 ratings Write a review
Out of stock
us Imported from USA store
Our Top Logistics Partners
  • fedex
  • dhl
This collar is designed to fit neck sizes from 12 to 17 inches, ensuring a snug and comfortable fit for your pet.
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

Durable Design
Crafted with high-quality leather, this collar withstands daily wear and tear, ensuring your pet's safety and comfort while maintaining a stylish gothic look.
Adjustable Fit
The adjustable collar size ensures a perfect fit for various neck sizes, accommodating both dogs and cats while providing a snug and comfortable wearing experience.
Unique Aesthetic
Featuring a distinctive gothic style with a love lock detail, this collar is not only functional but also serves as a fashion statement for pet owners seeking to express their unique style.

Product Details

Shop AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red online at a best price in Ethiopia. B0CFY4K8K2

Who Should Buy?

Suitable For
  • Stylish Pet Owners

    Those looking to accessorize their pets with a fashionable and unique gothic-themed collar will appreciate this product.

  • Durable Usage

    Owners of strong and active pets who need a resilient collar for everyday use will find this collar beneficial.

  • Gift Seekers

    Ideal for individuals searching for a creative and memorable gift for fellow pet enthusiasts or friends.

Not Suitable For
  • Small Breeds

    Small pets may find this collar too bulky or heavy, affecting comfort during use.

Product Description

AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red

Have any Query? Chat with us

Customer Questions & Answers

  • Question: What sizes does this collar fit?

    Answer: The collar fits neck sizes from 12 to 17 inches.
  • Question: Is the leash included with the collar?

    Answer: Yes, the collar comes with a 40-inch leash.
  • Question: What makes the D-ring special?

    Answer: The 360-degree swivel metal D-ring prevents leash tangling during walks.

AWISZZZ Basic Collars Editorial Review

No editorial reviews found

Customer Reviews & Ratings

5.0
1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Platform Trust & Buyer Confidence

trustpilot logo
4.3/5 9,000 + reviews
Read reviews
MT
Mohd
Verified buyer

“The product received very good packaging & safe…Thank You”

16 June 2026 · via Trustpilot
SJ
Shawati
Verified buyer

“Accurate delivery timing given”

16 June 2026 · via Trustpilot
YB
Youcef
Verified buyer

“Not madly expensive like I thought, and much quicker than promised.”

15 June 2026 · via Trustpilot
LM
Leila
Verified buyer

“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”

6/7/2026 · via Trustpilot
KA
Kwame
Verified buyer

“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”

12 June 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.